Accreditation Eligibility and scope inquiries are accepted year-round. Begin with a no-fee eligibility and scope review. Start Free Eligibility Review · Current program status
Eligibility reviews open year-round · No fee Verify AccreditationContactMy CHSPS
CHSPS — Commission for Health, Safety & Professional Standards
CHSPS Technical Publications

Technical notes & methods

Controlled, nonnormative publications that explain technical methods, evidence models and emerging assurance risks without creating new accreditation requirements. Use them alongside the applicable CHSPS standard, policy or formal interpretation.

RequirementsStandards & policiesNormative obligations
ClarificationFormal interpretationsControlled meaning
MethodsTechnical notesNonnormative guidance
MeasurementFrameworks & specificationsDefined data methods
Publication authority

Know what kind of document you are reading.

The technical-note series is part of the CHSPS controlled publication system, but its authority is deliberately different from an accreditation standard.

01Standard or policy

What must be satisfied?

Normative requirements and governed procedures are stated in the applicable controlled standard or policy.

Standards Registry →
02Formal interpretation

What does a requirement mean?

When a requirement needs controlled clarification, use a published interpretation rather than an informal explanation.

Standards Interpretations →
03Technical note

What method may help?

Technical notes explain methods, risks, examples and good practice. Findings still trace to the applicable standard or policy.

Browse technical notes →
04Measures publication

How is performance defined?

Measurement frameworks and specifications define data constructs, calculation logic, validation and governed reporting uses.

CHSPS Measures →
Nonnormative does not mean unofficial.

CHSPS-TR-001 through CHSPS-TR-004 are current controlled publications listed in the Master Controlled Document Register as Published Technical Notes, Edition 2026.1. They may guide method and analysis, but they do not independently create an accreditation obligation.

Technical Note Series 2026.1

Four current notes, each answering a different technical question.

Start with the question you are trying to answer, then read the note with the applicable standard or policy open beside it.

CHSPS-TR-00101

Evidence Quality in Accreditation Review

A practical method for testing authenticity, traceability, currency, implementation, sampling and consistency without turning document count into a score.

Use whenUse when the question is whether submitted evidence actually demonstrates a requirement.
EvidenceSamplingReview method
Read CHSPS-TR-001 →
CHSPS-TR-00202

Human Oversight of AI-Assisted Assessment

A four-tier impact model for AI used in content development, identity, proctoring, scoring support and other candidate-affecting functions.

Use whenUse when automated or AI-supported activity can influence assessment content, monitoring or candidate outcomes.
AIHuman oversightDue process
Read CHSPS-TR-002 →
CHSPS-TR-00303

Remote Examination Integrity

Technical guidance on identity, remote delivery, proctoring, accommodations, incidents, security and operational monitoring.

Use whenUse when evaluating the integrity and operating controls of remotely administered examinations.
IdentityRemote deliverySecurity
Read CHSPS-TR-003 →
CHSPS-TR-00404

Credential Performance Measurement

A measurement reference connecting measure design, calculation rules, validation logic and the CHSPS Credential Performance Data Set.

Use whenUse when defining, calculating, validating or interpreting credential-performance measures.
CPDSMeasuresValidation
Read CHSPS-TR-004 →
Choose the right technical source

Start with the question, not the document title.

This routing table keeps standards, interpretations, guidance and measurement publications from being used interchangeably.

QuestionPrimary sourceWhy
What requirement governs this accreditation file?Standard / policyThe finding must trace to the applicable controlled requirement.
What does a published requirement formally mean?Formal interpretationControlled interpretations clarify meaning without relying on informal guidance.
How can evidence sufficiency or sampling be analyzed?TR-001Provides the evidence-quality model, sufficiency test and sampling logic.
How should candidate-affecting AI be governed?TR-002Provides impact tiers, validation-file elements and human-oversight controls.
What technical risks matter in remote examination?TR-003Organizes identity, delivery, proctoring, security, accommodations and incidents.
How should credential performance measures be structured?TR-004Connects measure design and validation concepts to the CHSPS measurement system.
Technical guidance has a boundary.

Methods can inform review. Only controlled requirements create accreditation obligations.

When in doubt, start with the Standards Registry or a formal interpretation. Use technical notes to understand methods and risks, not to invent additional requirements.